Constant Temperture Bathroom Accessory Stainless Steel Electric Towel Rack

US$58.55
200-499 Pieces
US$53.23
500-1,119 Pieces
US$48.79
1,120+ Pieces
Port:
Ningbo, China
Production Capacity:
100pieces/Day
Payment Terms:
L/C, T/T, Western Union

Last Login Date:

Sep 19, 2023

Main Products:

Towel Warmer, Electric Cloth Airer, Heating Shoe Dryer Rack, Outdoor Chair, Aluminum Series

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
YW-80-1A
Warranty
3
Material
Stainless Steel
Type
Towel Racks
Number of Bars
Eight
Weight
3.4/4.2kg
Packing Size
815*50*525mm
Trademark
EVA E-heating
Transport Package
Carton
Specification
510*110*800mm
Origin
Zhejiang
HS Code
8501679900

Product Description

Electric towel warmer--Quick Details
 
Model
YW-80-1A
Power80W
Material
Stainless steelWarranty1 Year
Surface Finish
Mirror polish
Qty./Master
5 pcs
20'FTQty1120pcs
40'FT Qty
2240pcs
40'HQ Qty2640pcs
Place of Origin
Zhejiang, China


Function:Heating Wet Towel
Towel Rack Type:Movable Bath Towel Holder
After-sale Service:Online technical support
Project Solution Capability:graphic design
Certificate:CE, SAA, RoHS,EMC,LVD,REACH,UKCA,IP44
Application:Home.Hotel.Bathroom.Shower Room, Hotel, Villa, Apartment
Installation:Floorstanding
Surface treatment:45-55ºC/113-131ºF



Q&A

1.Q: What are the surface temperature and covering temperature?
A: The surface temperature is 45~55 degree celsius, and the temperature will remain between 
65~70 degree celsius after placing the item. for security!


2.Q: How long are the preheating and drying times?
A: The preheating time is about 5 minutes. Normally, it will take a night to dry the item.


3.Q: How long is the warranty?
A: We promise the warranty of one year. 


4.Q: What is your minimum order?
A: Our MOQ is always a 20'ft container. 
For trial orders, we also accept 100-200 pcs for eachmodel, but the price will be change.


5.Q: How about the packing?
A: The general packing is 1pc/pp bag+brown export carton. 
Mail order packing is 1pc/bubble bag+side foam+brown export carton.
Color box packing is 1pc/pp bag+color gift box; 5 pcs /master carton.


6.Q: When is the lead time?
A: Normally, Our lead time is 20-30 days for first order;
15-20 days for repeat orders on receipt of deposit.

 
Send your message to this supplier
Ms. Kin

Post a Sourcing Request Now

People who liked this also liked